inGauge executes water monitoring well and seismic campaign for NeuRizer

In early 2022, InGauge Energy commenced site works and subsequent drilling and seismic operations in the Telford Basin, as part of the data gathering for the future gas field development project in Leigh Creek. Earthmoving and civils equipment was mobilised in early March in preparation geotechnical drilling, seismic operations and the main investigation drilling campaign. Civils works commenced in March with construction including the main drilling pads and associated infrastructure to host the Silver City Drilling rig, Silver City Rig 4. A shallow Geotechnical investigation program commenced in March, with the 2 short campaigns concluding in April. The Drill Rig for the well campaign was mobilised in late April 2022 with drilling activities commencing in early May. This main drilling campaign targeted all 3 seams for evaluation and data gathering with all holes being completed for ongoing groundwater monitoring. Drilling activities concluded in July and was followed by a 3D seismic campaign that concluded in mid-August 2022.

 inGauge looks forward to continue our next project with NeuRizer in 2022.

Project Details

PROJECT GALLERY