DNRME has management responsibility for the ex-Linc Energy Hopelands UCG site near Chinchilla in Queensland since the Qld government took over the control of the site in 2016. Since that time inGauge has assisted DNRME with monitoring well design and well remediation and integrity projects. For this assignment inGauge teamed up with Silver City Drilling to drill and complete 7 new reservoir monitoring bores designed to monitor the Macalister coal seams and the overlying Springbok sandstone. The project is part of the ongoing expansion of the groundwater monitoring network. The wells were successfully completed with downhole gauges and low volume double-valve type sampling pumps to enable the collection of fluid samples for the duration of the monitoring program.
Learn more about the project here.
Galilee Energy – Glenaras Pilot Wells
inGauge Energy contracted by Galilee Energy to design and construct their Glenaras pilot wells.
Empire Energy – Carpentaria 1 (NT)
The completion of Capentaria-1 marks the first Northern Territory well for both inGauge and Empire Energy.
Project Kindy
inGauge is a proud sponsor of local Brisbane based charity Project Kindy that fundraises to support the construction and management of kindergartens in Malawi.