Beginning in February of 2021, inGauge oversaw the workover of ten wells including nine pump changeouts, perforating of 4 wells and data gathering from one for Galilee Energy. The wells were all located in the Glenaras Lateral Pilot area and were executed with rig contractor Wild Desert, Apex Pumps, and MPC Kinetic wireline services. So far the enhancement programme has been a success with pressure drawdown observed in the area resulting in an increase of natural gas rates close to 80 Mscfd. The data-gathering programme on Glenaras 08 also demonstrated a measurable pressure drawdown 7km away from the pilot area indicating a significant lateral reach of the pilot area.
The completions programme was a dynamic environment with a review of each well’s production within days of changeout. This created a feedback loop that led to optimising completion designs during the execution of the programme. Fortunately, Dylan Shaw our Well Engineer, was able to quickly adapt and ensure smooth operations. He was also invited to work several days a week in the Galilee office’s and was welcomed as part of the team.
Thank you to Wild Desert, Apex Pumps, MPC Kinetic wireline services and our OCR Ray Kirby for conducting all operations with zero HSE incidents. We couldn’t have had a better team for the job.
Learn more here.
Empire Energy announces significant footprint gain in the Beetaloo
Empire Energy has just announced the acquisition of an operated 82.5% interest in five tenements from Pangaea across the Beetaloo Sub-basin. This is transformational news for Empire and follows the outstanding result of the Carpentaria 1 discovery well in their Northern Territory acreage in late 2020.
Galilee Energy – Pump Enhancement Program
inGauge are again proud to support Galilee Energy on their Glenaras pilot wells in the Galilee Basin.
Leigh Creek announces commencement of the 2021 development project
Leigh Creek Energy announced this week the commencement of the 2021 drilling campaign. We are looking forward to delivering top quality and high integrity wells to meet the economic criteria and exceed environmental expectations.