DNRME has management responsibility for the ex-Linc Energy Hopelands UCG site near Chinchilla in Queensland since the Qld government took over the control of the site in 2016. Since that time inGauge has assisted DNRME with monitoring well design and well remediation and integrity projects. For this assignment inGauge teamed up with Silver City Drilling to drill and complete 7 new reservoir monitoring bores designed to monitor the Macalister coal seams and the overlying Springbok sandstone. The project is part of the ongoing expansion of the groundwater monitoring network. The wells were successfully completed with downhole gauges and low volume double-valve type sampling pumps to enable the collection of fluid samples for the duration of the monitoring program.
Learn more about the project here.
Leigh Creek Energy Project Commences Operational Activities with Stage 1 FI
2021 sees the commencement of planning and operations for Leigh Creek Energy. Following the successful completion of the Pre-commercial Demonstration (PCD) phase, inGauge Energy has been commissioned by Leigh Creek Energy to plan and execute the subsurface engineering phase of the Leigh Creek Energy Project (LCEP).
Empire Energy announces significant footprint gain in the Beetaloo
Empire Energy has just announced the acquisition of an operated 82.5% interest in five tenements from Pangaea across the Beetaloo Sub-basin. This is transformational news for Empire and follows the outstanding result of the Carpentaria 1 discovery well in their Northern Territory acreage in late 2020.
Galilee Energy – Pump Enhancement Program
inGauge are again proud to support Galilee Energy on their Glenaras pilot wells in the Galilee Basin.