07 3184 3510 [email protected]

DNRME has management responsibility for the ex-Linc Energy Hopelands UCG site near Chinchilla in Queensland since the Qld government took over the control of the site in 2016.  Since that time inGauge has assisted DNRME with monitoring well design and well remediation and integrity projects.  For this assignment inGauge teamed up with Silver City Drilling to drill and complete 7 new reservoir monitoring bores designed to monitor the Macalister coal seams and the overlying Springbok sandstone.  The project is part of the ongoing expansion of the groundwater monitoring network. The wells were successfully completed with downhole gauges and low volume double-valve type sampling pumps to enable the collection of fluid samples for the duration of the monitoring program.

 

Learn more about the project here.

Glenaras Pilot Enhancement Programme

Glenaras Pilot Enhancement Programme

inGauge provided engineering and project execution for the 2021 workover campaign aimed at enhancing production from the Glenaras Lateral Pilot area. The programme has now been completed and is showing signs of success with gas rates in the field increasing to near 80 Mscfd.

read more