Empire today updated the market with images of the flare at Carpentaria 1. This is a particularly exciting time for Empire as years of work starts to show itself in gas to surface. Tom (inGauge Completion Engineer) is getting to be an expert with the inGauge drone, taking some fantastic images of the flare shining forth on site, as the sun sets over the vast expanse of the Empire acreage. Tom was quoted as saying that using the drone was the only way of keeping Kelvin out of the photos.
 
Having completed the initial CTU unload, we are now preparing to run the production test completion in the well. Daniel, our frac engineer came back happy but exhausted after his stint on site, having encouraged every pound of the 1.4 million pounds of proppant pumped and then overseen the CTU operations.
 
Tom and Scott (inGaugue OCR), will oversee the next phase of the well on site as Empire tests the well to get data that will allow us to understand and develop the Beetaloo.
Latif, who has been project managing the project for inGauge couldn’t get to site himself as he is already planning the next operations.

See Empire Energy’s story here.

Glenaras Pilot Enhancement Programme

Glenaras Pilot Enhancement Programme

inGauge provided engineering and project execution for the 2021 workover campaign aimed at enhancing production from the Glenaras Lateral Pilot area. The programme has now been completed and is showing signs of success with gas rates in the field increasing to near 80 Mscfd.